Quality
Pre-Shipment Inspection in Indonesia: How Independent Surveyors Protect Commodity Buyers
PTC Export Desk4 min read

Pre-shipment inspection
Photo: Chuck Moravec · CC BY 2.0
Sampling, laboratory analysis, weight checks and loading supervision — how independent inspection works for copra, charcoal, coconuts and cocoa shipped from Indonesia.
When buyer and seller are thousands of kilometres apart, an independent inspection gives both sides a neutral, documented record of what was loaded. For agricultural commodities — where moisture, size and defects can vary from lot to lot — it is one of the most effective ways to reduce disputes and build trust.
What a surveyor checks
- Sampling according to the method agreed in the contract
- Laboratory analysis — for example moisture, oil content and FFA for copra, or fixed carbon and ash for charcoal
- Quantity and weight of the goods
- Packing and marking
- Container condition — clean, dry, free of holes and odours
- Loading supervision, container sealing and photographs
When inspection takes place
| Stage | Purpose |
|---|---|
| Before loading | Confirms the lot meets specification while it can still be corrected |
| During stuffing | Verifies quantity, packing and container condition, then seals the container |
| At destination | Provides an independent reference if the quality on arrival is questioned |
Who appoints and who pays
Both are agreed in the contract. Some buyers appoint their own surveyor; others accept a surveyor appointed by the seller. What matters is that the surveyor, the sampling method, the laboratory and the tolerances are written down before loading — and that a retained sample is kept in case of a dispute.
Working with PTC
PT Premium Tropical Commodities works with the independent surveyor Carsurin, and quality inspection can be arranged per inquiry. Buyers who prefer to appoint their own surveyor can do so, subject to agreement in the transaction.
Four tips for a smooth inspection
- Specify test methods and the laboratory, not just target values
- Agree tolerances and what happens if a result falls outside them
- Keep a sealed retained sample for each lot
- Review the inspection report before releasing the final payment
Frequently asked questions
What is pre-shipment inspection?
An independent check of quality, quantity, packing and loading carried out in the exporting country before the goods are shipped.
Who pays for the inspection?
It is agreed in the contract. Either the buyer or the seller can appoint and pay for the surveyor.
Can I use my own surveyor with PTC?
Yes, subject to agreement in the transaction. PTC also works with the independent surveyor Carsurin.
Have a question about this topic?
Our team will answer with specifications, availability and terms for your market.
